top of page
A E T H E S I S
Lauren Paese
Dr. John Messner
Bay Area Children's Hospital
Bay Area, CA
Mechanical Breadth
By prefabricating patient bed head walls on site or in a nearby shop, the project can potentially save time and help coordination. An analysis of the med gas connection and installation will be required.
Structural Breadth
An analysis of the compressive strength of the foam backfill will determine if it is strong enough to support a crane for any redesign. Calculations for the stress on the retaining wall will be performed.
bottom of page